top of page

Black River Wind Limited

In 2003 Livingston began to work on developing commercial-sized wind power projects in Nova Scotia. In 2005 he formed Black River Wind Limited with Peggy Cameron.

In late 2012 and 2013 Black River Wind Limited built and now has operating a 3 wind turbine 5600kw combined installation in eastern Nova Scotia and Western Cape Breton Island.

Black River Wind installations completed in 2013: 

•   592 Irish Mountain Road, Churchville, Nova Scotia B0K 1B0 

•   1419 General Line Road, Creignish Rear, Nova Scotia B9A 1E2 

•   Glenora Falls Road, Mabou, Nova Scotia B0E 1X0

Livingston has one of the first modern micro-hydro units at his home since 1980, stand-alone off-grid, and then in 1993 was the first to net meter with NS Power.

wind30.jpg
bottom of page